Brighton Kitchen »



We have finished a new kitchenette for a local travel firmĀ in Brighton incorporating new units and stainless steel tops. Decoration to the walls and a splash back to complete the works. Most of the work was completed out of hours to reduce disruption within the busy office.

2018-04-23 14.09.54

Posted on Apr 27, 2018 under Case Studies Portfolio Updates


New First Impressions »



A failing revolving door set was replaced with two sets of frameless glazed screens with sliding doors. The change has improved visibility to the reception area, brought more light into the space and assisted temperature control in the main reception. The area was refreshed with a new entrance mat system to help keep the area clean and dry. This now provides a more inviting entrance to this modern office building.

Spire Court Reception (5)

Posted on Jan 30, 2018 under Case Studies Portfolio


Absorbing Sounds »



DSC_7731

A Brighton music school required soundproofing to drum, guitar and vocal rehearsal spaces. The walls are built up with secondary soundproof partitioning with vibrant coloured sound absorbing panels to further control acoustics. Small stages were added to give students the feel of being “live on stage”, in some cases for the first time in their venture into a musical career.

Posted on Nov 16, 2017 under Case Studies Portfolio Updates


Warm Linings »



Ceuta Healthcare in Bournemouth had some heating changes to their building that left the external walls looking a bit worse for wear. CBS designed a systems that not only covered the existing walls but also hid unsightly pipe works also taking the opportunity to upgrade the perimeter three compartment trunking. The outcome also lifted the feel of the entire room making the whole area brighter. This was a continuation of a previous project completed entirely out of hours with very little disruption to the staff and meant no costly enabling moves were needed.

Posted on Feb 05, 2014 under Case Studies Portfolio